Public Meeting: NE Main Extension Project.

NE Transmission Main Public Meeting
City Logo

NOTICE OF PUBLIC MEETING

The City of Sheridan, Wyoming, will conduct a public meeting at 12:00 PM, local time, on March 26, 2024, in the City Council Chambers on the 3rd floor of City Hall.  The purpose of the meeting is to allow citizens to review and comment on the following project: Northeast Transmission Main Extension Project.  The proposed water transmission main was described in the 2019 Sheridan Water System Master Plan, Level I Study, and is intended to extend the water supply system through an area of Sheridan that is underserved, both on a location and capacity basis.  The extension will complete a transmission loop for the City and will provide major water transmission improvements to the northeast side of Sheridan to meet domestic needs, improve health and safety, improve pressure and increase flows in the area. At the meeting, the City of Sheridan will present the preliminary design of the proposed project and will discuss the estimated cost and the plan for funding the project.  A preliminary plan, cost estimates, and the funding plan can also be reviewed at the City of Sheridan, Engineering Department, 55 Grinnell Plaza, Sheridan, WY.  Contact Mr. David Ford, City of Sheridan Project Engineer, at (307) 675-4258. Based on current cost estimates, the City of Sheridan plans to borrow $1,900,000 from the Wyoming Drinking Water State Revolving Fund (DWSRF) administered by the Wyoming Office of State Lands and Investments.  No increased user fees are anticipated to repay the loans.  The loan terms are requesting a 1.25% interest rate for 20 years if principal forgiveness is not available.  Written comments are also welcome.  Send written comments to David Ford, 55 Grinnell Plaza, Sheridan, Wyoming, 82801 by 12:00 PM on March 26, 2024. Para español, visite deq.wyoming.gov